If you’re thinking of adding a backyard pool to your Orange County, CA home, one of the first questions you might ask is, “How long does it take to build a pool?” The answer isn’t as simple as you’d hope but we’ll break it all down for you so you have a clear understanding of the pool construction process and timeline.

How long does it take to build a pool?

The short answer is 8 to 12 weeks from start to finish. But that can vary greatly depending on the type of pool, design complexity, local regulations and weather. In Orange County, CA where the weather is generally good year round, you’ll have fewer weather delays than other areas.

Pool construction

The pool construction process has several stages, each with its own timeline. From design to finish, every step matters in your backyard paradise.

Building a pool

Building a pool is a process that requires planning and execution. Building your own pool can be a feasible and cost-effective option, potentially saving you money by avoiding high quotes from pool companies. It involves multiple professionals including designers, excavators, plumbers, electricians and landscapers all working together to bring your vision to life.

Pool installation

Pool installation is the meat of the construction process. The installation of a concrete pool involves pouring and curing concrete within a reinforced excavation, ensuring the structure is level and finished with materials like stone or tile. This phase includes excavation, framing, plumbing, electrical work and finishing touches like plastering or liner installation.

Pool builder

Selecting the right pool builder in Orange County is key to a smooth construction process. Look for experienced contractors with good reputations and local knowledge.

Pool contractor

A good pool contractor will manage the entire project, coordinating with other professionals and making sure each stage of construction runs smoothly and on schedule. The initial consultation and design process are crucial steps before starting pool construction, as they set the foundation for a successful project.

How long does it take to design a pool?

The design phase of pool construction takes 2-4 weeks depending on the complexity of your project and how fast you can make decisions. This is the most important phase of the project.

Pool designer

A good pool designer will help you create a pool that meets your functional needs and complements your home and landscape. In Orange County where outdoor living is a big part of the lifestyle, a well designed pool can add significant value to your property.

Pool design

The pool design process is more than just choosing the shape and size of your pool. It’s deciding on depth, entry points, water features, lighting and surrounding landscaping.
Contact a contractor
When you’re ready to move forward with your pool project, it’s time to contact pool contractors. Look for licensed and insured professionals with experience building pools in Orange County. Don’t be afraid to ask for references and examples of their work.

Types of Pools

The type of pool you choose will impact the construction timeline and overall look of your backyard. Inground pools, for example, require essential installation components such as support systems, plumbing, and electrical lines to ensure proper depth, shape, and functionality. Here are some options:

2.4.1 Lap Pools

Lap pools are specifically designed for exercise, typically ranging from 30 to 70 feet in length. They are ideal for swimming laps and are often compared to other types like endless pools and plunge pools. Lap pools are a practical choice for those who prioritize fitness and have the necessary space for a longer pool.

2.4.2 Natural Pools

Natural pools are an appealing option for individuals sensitive to chlorine. These pools use natural filtration systems and are considered environmentally friendly. They require less maintenance and are a great choice for health-conscious customers looking for a more natural swimming experience.

2.4.3 Plunge Pools

Plunge pools are much smaller than traditional pools, typically around six-by-six feet in size. They are suitable for those with limited space or budget, offering a versatile option among various pool types, including lap pools and infinity pools. Plunge pools provide a refreshing dip without the need for a large area.

Rectangular Pools

Rectangular pools are traditional and versatile. Great for lap swimming and have the shortest construction time due to their simplicity.

Oval Pools

Oval pools have a softer look than rectangular pools and still offer plenty of swimming space. A good compromise between traditional and freeform designs.

Multi-sided Pools

Multi-sided pools like hexagonal or octagonal shapes can be a focal point in your backyard. They may take a little longer to construct due to their complexity.

Get Permits

Before any construction can start you’ll need to get the permits. This takes 2-6 weeks in Orange County, CA.

Permits

Permits are required for pool construction in Orange County. These ensure your pool meets all local safety and building codes.

Pool permit

A specific pool permit may be required in addition to the general building permit. This involves submitting detailed plans of your pool to the local authorities.

Do I need a permit to fill in a pool

While this article is about building pools, note that in most cases you do need a permit to fill in an existing pool in Orange County. Always check with the local authorities before making any changes to your property.

California regulations

California has some of the toughest pool safety regulations in the country. These include pool fencing, safety covers and anti-entrapment devices. Your pool contractor should be knowledgeable on these regulations and ensure your new pool is fully compliant.

Excavation

Once permits are in hand excavation can begin. This phase takes 1-2 days for a standard residential pool.

Pool excavation

Pool excavation is the process of digging out the shape of your pool to the desired depth. In Orange County where the soil can be sandy to clay like, excavation may require special equipment or techniques.

Site work

Before excavation can begin the site needs to be prepared. This may involve removing obstacles, leveling the ground or addressing drainage issues.

Dirt removal

A lot of dirt will be removed during excavation. Your contractor should have a plan for either re-distributing this dirt on your property or hauling it away.

Steel, Plumbing and Electrical

After excavation the next phase is to install the pool’s infrastructure. This takes 1-2 weeks.

Steel pool

For concrete pools a framework of steel rebar is installed to support the structure. Selecting the right pool liner, such as vinyl, fiberglass, or concrete, is crucial during the planning and installation phases. This creates the skeleton of the pool.

Pool plumbing

Pool plumbing is the installation of the circulation system, including pipes for water intake and return and any water features you’ve chosen.

Pool electrical

Electrical work for your pool is the wiring for pumps, filters, heaters and lighting. This must be done by a licensed electrician and meet all local codes.

Gunite, Plastering, Vinyl, Fiberglass

Next is the actual pool shell. This time frame varies depending on the type of pool you’ve chosen.

Gunite pool

Gunite pools which are popular in Orange County due to their durability and customizability take the longest to build. After the gunite is sprayed (1 day) it needs to cure for about a week before plastering can begin.

Pool plastering

Plastering gives your pool its final smooth surface and takes 1-2 days. After plastering the pool must be filled immediately.

Vinyl pool

Vinyl liner pools can be installed faster than gunite pools. The liner installation itself takes a day but the pool walls and floor must be prepared beforehand.

Fiberglass pool

Fiberglass pools have the fastest installation time. The pre-formed shell can be set in place in a day or two and reduces the overall construction time.

Deck, Landscaping, Custom Features

The final phase of pool construction is the finishing work around the pool. This can take 1-4 weeks depending on the complexity of your design.

Pool decking

Pool decking, including the essential pool deck, takes 3-5 days. Popular options in Orange County are concrete, pavers and natural stone.

Pool landscaping

Landscaping around your new pool can take a few days to a couple of weeks. This phase is where you integrate your new pool into your existing backyard.

Custom pool features

Custom features like waterfalls, spa attachments or unique lighting can add to the construction time but can also make your pool one-of-a-kind. Additionally, having appropriate and functional pool equipment is crucial for maintaining water quality and ensuring effective drainage.

Total time to build a pool

Here’s a summary of the timeline for swimming pool construction in Orange County, CA:

  1. Design Phase: 2-4 weeks
  2. Permitting: 2-6 weeks
  3. Excavation: 1-2 days
  4. Steel, Plumbing and Electrical: 1-2 weeks
  5. Pool Shell (varies by type):
    • Gunite: 1-2 weeks
    • Vinyl: 3-5 days
    • Fiberglass: 1-3 days
  6. Decking and Landscaping: 1-4 weeks

In total you can expect your pool construction project to take 8-12 weeks or longer for more complex designs or if there are delays in permitting or material delivery.